Home / Quality & Compliance

Quality built into delivery

Resource Ready uses documented checks appropriate to the product and the project requirement — from the initial requirement review through to the delivery record.

Process

Eight checkpoints, every requirement.

  1. 01

    Requirement review

    Confirm specification, quantity, timeframe and delivery requirement before anything is sourced.

  2. 02

    Material verification

    Verify incoming materials against the applicable project requirements.

  3. 03

    Production / preparation control

    Use repeatable preparation and handling processes.

  4. 04

    Quality verification

    Perform relevant checks such as weight, quantity, condition, moisture or dimensions where required.

  5. 05

    Packing & identification

    Check packaging, labelling and batch identification, and prepare for transport.

  6. 06

    Dispatch control

    Confirm quantities and destination before release.

  7. 07

    Delivery record

    Maintain delivery and acceptance documentation.

  8. 08

    Non-conformance

    Identify, isolate and correct any product that does not meet requirements.

Documentation

Records kept against each requirement.

These are operational records, not claimed third-party certifications.

  • Incoming Material Inspection
  • Production Batch Record
  • Weight Verification Log
  • Moisture Log
  • Packing Checklist
  • Dispatch Checklist
  • Delivery Record
  • Non-Conformance Record
Continuity

Contingency & continuity

Planning for the requirement to still be met when the first option isn't available.

  • Alternate suppliers — more than one sourcing option identified where practical.
  • Material availability — checked ahead of committing to a timeframe.
  • Backup sourcing — a fallback plan for constrained materials.
  • Transport alternatives — options considered for delivery constraints.
  • Labour planning — capacity matched to the requirement.
  • Equipment contingency — backup arrangements for key equipment.
  • Surge requirements — planning for demand above the normal baseline.
  • Pre-event planning — preparation ahead of known peak-demand periods, such as severe weather.

Want to understand our process in more detail?

Happy to walk a procurement team through how a requirement moves from review to delivery.